Orange Heights Switching Station 230-69kV and ESII Project
PROJECT DETAILS
-
PROJECT NAME
Orange Heights Switching Station 230-69kV and ESII Project
-
LOCATION
Orange, NJ
-
KEY DATES
August 2022 – March 2024
SERVICES PROVIDED
- Heavy Civil
- H Beam Pile Installation
- Large Slab Foundation Encasement and Finishing (Ground Level and Elevated)
- Precast Panel & Steel Erection
- Yard Foundations
- Duct Bank Installation
- Interior Fit-Out of Electrical, Plumbing and Stud Wall Installation
- Caisson Drilling
QUICK STATS
-
Orange Heights Switching Station 230-69kV and ESII Project
J. Fletcher Creamer & Son, Inc. was tasked to build a brand new switching station on a green field to be named Orange Heights Switching Station.
It is comprised of:
-
- 4kV, 69kV, and 230kV systems
- 3 story GIS Building
-
- 6 transformer containment systems
-
- 1 elevated poured in place 4kV switchgear platform
-
- A 50 foot high precast perimeter wall
-
- A 36” Diameter Jack & Bore approx. 170’ long under existing NJ Transit Train Tracks.
There have been approximately 5,600 CY of concrete encased, 410 H Beam piles installed, 32 7’- 8’ Diameter Drilled Shaft Foundations, 1,5000 LF of duct bank installed, and 400 pieces of individual precast panels, columns, manholes, and blast walls installed, to name a few high-level tasks. Multiple Creamer trades and crews performed various tasks, working 12 hour days, 7 days a week in order to meet the client’s aggressive and tight schedule.
-