- New drainage infrastructure including 2,900 LF of RCP, 24 Catch Basins and Manholes, 3 water quality structures, and flared end and headwall type outfalls with scour holes.
- 3,800 LF of sanitary force main and 5 air valve chambers
- Relocation of existing OH utilities, water, and gas as needed for improvements
- Relocation of NJDOT light pole
- Clearing, cut/fill grading, realignment, and reprofiling of the entire length of the road
- 3,500 LF of concrete curb
- 19,500 SY of milling
- 11,200 tons of asphalt
- 2,200 LF of driven post and structure mounted guide rail and end treatments
- Striping and signage
- Topsoil, seeding, and restoration
QUICK STATS
-
Lamberton Road Widening Project HRP Mercer Logistics Park - HRP Mercer Urban Renewal LLC
The client is redeveloping the former PSEG Mercer Generating Station into a 1.2M SF Logistics Park in Hamilton Township, New Jersey. As part of the project, J. Fletcher Creamer & Son, Inc. was awarded the contract to widen and reconstruct 1.4 miles of municipal road that provides access to the site and adjacent properties. The roadway improvements were completed in parallel with the site development and maintained access for construction and local traffic at all times.