Bergen to Linden Corridor (BLC) Newark Bay Crossing via HDD

J Fletcher employees at work for Bergen to Linden Corridor (BLC) Newark Bay Crossing via HDD

PROJECT DETAILS

  • PROJECT NAME

    Bergen to Linden Corridor (BLC) Newark Bay Crossing via HDD

  • LOCATION

    Newark Bay, NJ

  • KEY DATES

    Completion Date: 2018

  • COST

    N/A

SERVICES PROVIDED

  • Heavy Civil
  • Crane Services
  • Material Procurement
  • Welding Services & Inspection
  • Environmental Testing of Spoils
  • Water & Spoils Management

QUICK STATS

  • Bergen to Linden Corridor (BLC) Newark Bay Crossing via HDD

    J. Fletcher Creamer & Son, Inc. was awarded the BLC Newark Bay Crossing via Horizontal Directional Drilling Contract. The Newark Bay Crossing included two 1.25 miles horizontal direction drills (HDD), 120U. under Newark Bay, NJ for the installation of two 36” diameter casings, which accommodate a high-density polyethylene (HDPE) conduit bundle grouted in place. The 6,700U long sections under Newark Bay are currently the longest continuous 345kV cable sections installed by trenchless method in North America

    Other highlights included:

    • 4 – 50’x 10’x 8’ HDD anchor manholes
    • 13,400 U of 36” steel casing
    • 54,000 U of 10 HDPE conduit
    • 15,000 U of 5” HDPE conduit
    • 28,000 U of 3” HDPE conduit
    • 21,000 U of 4” HDPE grout tubes