Absecon Inlet Coastal Storm Damage Reduction Project

Aerial view of Absecon Inlet Coastal Storm Damage Reduction Project

PROJECT DETAILS

  • PROJECT NAME

    Absecon Inlet Coastal Storm Damage Reduction Project

  • LOCATION

    Atlantic City, NJ

  • KEY DATES

    Project Start: October 2020, Completion: December 2021

  • COST

    $40 Million

SERVICES PROVIDED

  • Heavy Civil
  • Crane Services
  • Material Procurement
  • Helical Pile Installation
  • Manhole and Duct Bank Installation
  • Environmental Testing of spoils
  • Water & Spoils Management

QUICK STATS

  • Atlantic City Electric Harbor Beach - Transmission Duct Bank

    J.Fletcher Creamer & Son, Inc. was awarded the Atlantic City Electric Ontario to Harbor Beach and Huron to Harbor Beach 69kV Transmission Duct Bank.

    The project scope includes:

    • Two (2) 69kV transmission duct banks
    • Five (5) segments, encompassing a total of 2.75 miles in length / duct bank
    • 26 Manholes and Handholes
    • One (1) bridge crossing (under-bridge mounted)
    • All associated termination structures
    • Restoration
    • Traffic Control