  • Troublesome Brook Pump Station Construction

    J. Fletcher Creamer & Son, Inc. (“Creamer”) was awarded the Troublesome Brook Pump Station construction. This project includes all the work associated with building a new pump station in Eastchester, New York. At the completion of this project, Creamer will be providing the community with a new pump station that has the ability to treat and distribute water in a method that is up to speed with changing water regulations.

    To date, Creamer has completed all major portions of construction and has begun the plant startup phase to treat and distribute water throughout the system.

    The construction of the new pump station will include:

    • 12” – 48” ductile iron pipe work
    • Installation of a soldier beam and lagging excavation support for the excavation and installation of the proposed foundation
    • Concrete foundation
    • Interior large diameter process piping
    • Installation of a hypochlorite generation system