J. Fletcher Creamer & Son, Inc. was contracted for a project on the Garden State Parkway. The project involved the installation of new duct banks to move overhead electric and telecommunications lines underground for the widening of the Garden State Parkway overpasses between mileposts 30 and 35.
Other highlights included:
- Installation of 2, 8 x 20 electric manholes along with 450’ of 3 x 3 6” duct bank
- Installation of telecommunication duct banks ranging from (1-15) 4” ducts for Verizon, Comcast, and Crown Castle