Absecon Inlet Coastal Storm Damage Reduction Project
PROJECT DETAILS
-
PROJECT NAME
Absecon Inlet Coastal Storm Damage Reduction Project
-
LOCATION
Atlantic City, NJ
-
KEY DATES
Project Start: October 2020, Completion: December 2021
-
COST
$40 Million
SERVICES PROVIDED
- Heavy Civil
- Crane Services
- Material Procurement
- Helical Pile Installation
- Manhole and Duct Bank Installation
- Environmental Testing of spoils
- Water & Spoils Management
QUICK STATS
-
Atlantic City Electric Harbor Beach - Transmission Duct Bank
J.Fletcher Creamer & Son, Inc. was awarded the Atlantic City Electric Ontario to Harbor Beach and Huron to Harbor Beach 69kV Transmission Duct Bank.
The project scope includes:
- Two (2) 69kV transmission duct banks
- Five (5) segments, encompassing a total of 2.75 miles in length / duct bank
- 26 Manholes and Handholes
- One (1) bridge crossing (under-bridge mounted)
- All associated termination structures
- Restoration
- Traffic Control