Vela Town Homes
EDGEWATER, NEW JERSEY — This project required both general constructions and specialty services, including installation of steel pipe piles and pile supported roadway slab that required pre-drilling for the piles to a depth of 30 feet using JFC’s Bauer drill rigged with a 14 inch down the hole hammer. This project also required a 500 ton pile load test and the roadway slab required 32 precast box beams. Other work items included site excavation, grading and utilities.